Stormwater Improvement Project
Braintree Electric Light Department
Braintree, MA
Services Provided:
|
Project Description:
The objective of the project was to improve storm water management systems within a petroleum release area to eliminate infiltration into the system and preferential migration of petroleum along the system pathway. To the degree possible, improvements were also designed to provide sufficient grading to allow for free flow of storm water runoff from the project area, to minimize standing water within the drainage area serviced by system improvements, and to eliminate flooding and to allow for full use of existing buildings and paved areas. |