Water Tank Decomissioning
and Soils Management
Woburn, MA
Water Tank Decommissioning and Limited Removal Action
Problem:
The Town needed to remove a municipal water tank covered with lead paint located in a residential area.
Services Provided:
ES&M provided LSP services and health and safety monitoring related to the demolition of the tank. Following the tank removal, ES&M conducted post demolition confirmatory soil sampling. Pesticides were discovered in soil during the confirmatory sampling. ES&M performed a time-sensitive limited removal action under the MCP to eliminate the pesticides in soil.
The Town needed to remove a municipal water tank covered with lead paint located in a residential area.
Services Provided:
ES&M provided LSP services and health and safety monitoring related to the demolition of the tank. Following the tank removal, ES&M conducted post demolition confirmatory soil sampling. Pesticides were discovered in soil during the confirmatory sampling. ES&M performed a time-sensitive limited removal action under the MCP to eliminate the pesticides in soil.