Seawall Repairs and Replacement
Quonset State Airport
North Kingstown, RI
Engineering ServicesThe seawall repair and replacement project was a two-phase project that commenced with the inspection of a large sink hole near the south end of the North-South runway. Based on the initial inspection, the southerly section of the seawall was repaired, using PVC sheet piles. The second construction phase near the north end of the seawall utilized fiberglass sheet piles and precast concrete blocks to stabilize the shoreline and to prevent erosion.
Work Scope:
|